Carrier 48HDT User Manual
Connbination heating/cooling units
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
![background image](/manuals/717670/1/background.png)
Carrier Corporation • Syracuse, N Y 13221
Connbination Heating/Cooling Units
INDEX
P a g e
SAFETY CONSIDERATIONS.................................... 1
INSTALLATION .......................................................1-16
Step 1 — Provide Unit Support .............................. 1
• R O O F C U R B
• S L A B M O U N T
Step 2 — Field Fabricate Ductwork........................ 1
Step 3 — Rig and Place Unit.................................... I
• P O S I T I O N I N G
Step 4 — Install Flue Hood ..................................... 3
Step 5 — Trap Condensate Drain ........................... 3
Step 6 — Install Gas Piping..................................... 3
Step 7 — Make Electrical Connections.................. 3
• F I E L D P O W E R S U P P L Y
• F I E L D C O N T R O L W I R I N G
• H E A T A N T I C I P A T O R S E T T I N G S
Step 8 — Make Outdoor Air Inlet Adjust
ments and Install Outdoor Air Hood.....................
• O P T I O N A L O U T D O O R A I R D A M P E R
• O P T I O N A L E C O N O M I Z E R
Evaporator Fan Speed........... 16
START-UP.............................................................. 16,17
SERVICE.................................................................
18-22
SAFETY CONSIDERATIONS
Installation and servicing of air conditioning
equipment can be hazardous due to system pressure
and electrical components. Only trained and quali
fied service personnel should install, repair or
service air conditioning equipment.
Untrained personnel can perform basic mainte
nance functions of cleaning coils and filters and
replacing filters. All other operations should be per
formed by trained service personnel. When workiog
on air conditioning equipment, observe precautions
in the literature, tags and labels attached to the unit
and other safety precautions that may apply.
Follow all safety codes. Wear safety glasses and
work gloves. Use quenching cloth for unbrazing
operations. Have fire extinguishers available for
all brazing operations.
" W A R i i l N i J c Before g«:Tf<*rî3aîït^ service
EEteîïtî£eitî3ïiee «peîatîoîîs oa
power switch
to
’tiott- Eted:ricaî
cooïd
catîse
soçipiiçtl j^$ pî|îiï^ m
above fjS
oiîit
VâiYov^îaitôihe^&Èotsoected
fiotti
Û,S
SfÊSS»!!
INSTALLATION
NOTE: 004,005,006 size units in California require
the installation of an accessory NOx baffle. Refer to
Accessory NOx Baffle Installation Instructions for
details.
Step 1 — Provide Unit Support
ROOF CURB (Downshot Units Only) — Assemble
and install accessory roof curb in accordance with
instructions shipped with curb. Curb details and
information required to field fabricate a roof curb
are shown in Fig. 1. Install insulation, cant strips,
roofing and flashing as shown.
Ductwork must he
attached to curb.
Oie^sfcehsig of the
roof cîïïh- is CFîîîcaJ ii>r wter i'aiegjtiij'. ïastaif
^pasîietîsîg ïoàtertaî. with the ccxif corb as
io L
Curb should be level. Unit leveling tolerance is
1/16 in. per linear foot in any direction. This is
necessary for unit drain to function properly. Refer
to Accessory Roof Curb Installation Instructions
for additional information as required.
SLAB MOUNT (Horizontal Units Only) — Provide
a level concrete slab that extends a minimum of 6 in.
beyond unit cabinet. The slab should be 8 in. thick
with 4 in. above grade. Install a gravel apron in front
of condenser air inlet to prevent grass and foliage
from obstructing airflow. Trap condensate drai.n.
Allow for trap when pouring slab.
Step 2 — Field Fabricate Ductwork
— On
downshot units secure all ducts to roof curb and
building structure.
at
^ 45 m fern, A mk
ssaiïtîiihjî do$ü3Etg thè .gas. i?aìYe<$ìii,
Insulate and weatherproof all external duct
work, joints and roof openings with flashing and
mastic in accordance with applicable codes.
Ducts passing through an unconditioned space
must be insulated and covered with a vapor barrier.
A minimum clearance is not required around
ductwork. Cabinet return air static shall not exceed
-.35in.wg with economizer or -.45in.wg without
economizer.
Step 3 — Rig and Place Unit
— Inspect unit for
transportation damage. File any claim with trans
portation agency. Keep upright and do not drop.
Carrier Corporation 1984
Form 48H.L-7SI
Document Outline
- Connbination Heating/Cooling Units
- INDEX
- SAFETY CONSIDERATIONS
- soçipiiçtl j^$ pî|îiï^ m above fjS
- at ^ 45 m fern, A mk
- 44
- I—dn
- Step 8 — Make Outdoor Air Inlet Adjustments and Install Outdoor Air Hood
- Outdoor Air Hood Details (008 Units)
- Fig. 12 — Damper Blade Adjustment (008 Units)
<Ì3> - Viol
- Fig. 15 — Control Box Details (008 Units)
- Step' 9 — Adjust Evaporator Fan Speed — On
- Fig. 36 — Cooling Charging Chart; 48LDT004
- Fig. 37 — Cooling Charging Chart; 48HDT,LDT005
- Fig. 38 — Cooling Charging Chart; 48HDT.LDT006; HH.LH006
- Fig. 40 — Cooling Charging Chart; 48HD.LD,HH.LH008
- Fig. 39 — Cooling Charging Chart; 48HD,HH007
- Fig. 41 — Cooling Charging Chart; 48HDD.LDD.HHD,LHD008
- TYPICAL WIRING DIAGRAM NOTES (48HD,LD008)