Setup program, Appendix c, “configuring the switch, With the cli-based setup program – Cisco 3750 User Manual
Page 73: And refer to the sw, Appendix c

C-1
Catalyst 3750 Metro Switch Hardware Installation Guide
OL-9160-02
A P P E N D I X
C
Configuring the Switch with the CLI-Based
Setup Program
This chapter provides a quick step-by-step installation and setup procedure for a switch.
Note
For detailed installation procedures on rack mounting your switch or connecting to the small form-factor
pluggable (SFP) modules, see
Chapter 2, “Switch Installation.”
For product overview information, see
Chapter 1, “Product Overview.”
These steps describe how to do a simple installation:
1.
Taking Out What You Need, page C-2
2.
Connecting to the Console Port, page C-3
3.
Starting the Terminal-Emulation Software, page C-3
4.
Connecting to a Power Source, page C-4
5.
Entering the Initial Configuration Information, page C-4
6.