beautypg.com

Tii FDH1 User Manual

Page 10

background image

10

Tii Network Technologies Inc. 2012

9.4. Install Cables

9.4.1. Overall lengths will be dependent on work station location to the FDH
9.4.2. The FDH can store approximately 20 ft of feeder cable and home run MDU drops.
9.4.3. Secure cables to provided top and bottom cable entry tie down points using zip ties or hose

clamps as appropriate.

9.4.4. Ground and bond any armored cable to provided ground lugs
9.4.5. Pre-measure and cut to length cables to termination points (dependent to configuration – patch,

patch & splice or PON).

















9.5. Work Area Setup

9.5.1. Set a portable table as close to final installation site as feasible and stage items.
9.5.2. Hand tools.
9.5.3. Splicer & Cleaver (if required).
9.5.4. Cleaning supplies.
9.5.5. If configured remove pigtail from slack storage up to breakout, ensure pigtails reach workspace

or remove adapter plates if necessary.