T ech nic al i nfo rm atio n, 3 never – Reznor EFMA Unit Installation Manual User Manual
Page 7

7
2. T
ech
nic
al i
nfo
rm
atio
n
1.3 Never
• Install EFMA sections so that the heating cables are less than 76 mm (3”) from each
other. The temperature could be too high and could cause damages;
• Shorten or alter any part of the heating cable (Fig. 1.3);
• Cross, overlap, or stack heating cables (they must not touch);
• Connect a 120V product to a 240V/208V power source;
• Use a bending radius under 20 mm (¾”);
• Install a temperature regulator (thermostat or other) where it is accessible from the
shower or bath (install at least 1 m [3’ 4”] away);
• Staple heating cable or floor sensor end to the subfloor (Fig. 1.3);
• Install the EFMA system if the safety seal is broken;
• Install the EFMA system under a closet or fixed items.
• Series heating cable sets shall not extend from beyond the room or area in which
they originate;
• Series heating cable sets are not to be installed in walls.
Ne
ve
r cu
t the heating c
ab
le
N
ev
er
st
ap
le
the
hea
ting cable t
o th
e s
ub
flo
or
N
ev
er
st
ap
le
the
floor sensor to t
he
su
bfl
oo
r
D
o
no
t l
ay
he
avy items on EFM
A c
ab
le
Fig. 1.3
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)