beautypg.com

Reznor EFMA Unit Installation Manual User Manual

Page 6

background image

6

1.2 Always

• Read this guide in full before installing the product;
• Install the EFMA system with a regulating device;
• Use copper wires only;
• Perform the mandatory tests described in this guide and record readings on the

table of measures;

• Only use cement or an equivalent binder compatible with floor heating systems

(cement glue, ceramic glue, self-levelling cement);

• Ensure that the black heating cable is completely embedded in cement or an equiv-

alent binder (cement glue, ceramic glue, self-levelling cement);

• Ensure that the voltage supplied equals the nominal voltage of the EFMA system;
• Repair the product only using the EFMA repair kit available at your authorized

REZNOR dealer;

• Consult REZNOR’s team of technical specialists for any questions or for more

information;

• Install EFMA at temperatures over 5 °C (40 °F).
• Heating cables must be at least 13 mm (½”) away from any combustible surface.
• Metal structures or materials used for the support of or on which cables or sets

are installed be grounded in accordance with the Canadian Electrical Code (CSA

C22.1 Section 10 and National Electrical Code).

• The installer of series heating cable sets must inspect and remove damaged or

defective heating cable sets before they are covered or concealed;

• The installer of series heating cable sets must mark the appropriate circuit breaker

reference (label) indicating which branch circuit supplies the circuit to those

electric heating cables.