beautypg.com

0 suspending and mounting (cont'd), 0 mechanical, 1 unit inlet air – Reznor RBL (Cabinet Blower) Unit Installation Manual User Manual

Page 4

background image

Form I-RBL, P/N163219R2, Page 4

4.0 Suspending and Mounting (cont'd)

Optional

Downturn Plenum

Blower

Cabinet

Curb

Cap

1-7/8”

(48mm)

Roof

Curb

16” (406mm)

1-7/8”

(48mm)

AC

D

Return

Duct

Supply

Duct

1-7/8”(48mm)

1-1/2”

(38mm)

Lift Holes

(4 corners)

B

* C and D are roof opening dimensions.

FIGURE 5 - Roof Curb Dimensions (inches/mm)

and Installation

16”

(406mm)

1-7/8”(48mm)

(102mm)

2 x 6 Wood Nailer

1-1/2 x 3 lb

Fiberglass

Flashed by the

installer (flashing must

be under lip of curb)

Lag Screw

Cap

Screws

Curb Cap

Counter Flashing

(by installer)

Cant Strip

(by installer)

MUST be sealed

between curb cap

and roof curb

2 x 6

Wood

Nailer

Insulation

16”

(406 mm)

Curb Height

Cabinet

Curb Cap “Skirt”

Weld, bolt, or lag screw curb to deck structure.

Roof Curb

Roofing Felts

(by others)

Curb Section

Curb Corner Detail

Curb

Detail

See

FIGURE 5.

Model RBL without Optional Downturn

Plenum - Roof Curb Option CJ1

Model RBL with Optional Downturn Plenum Cabinet

(Option AQ5 or AQ8) - Roof Curb Option CJ2

A

59-1/16" (1500mm)

82-1/16" (2084mm)

B

53-9/16" (1361mm)

28-13/16" (732mm)

C*

55-5/16" (1405mm)

78-5/16" (1989mm)

D*

49-13/16" (1265mm)

49-13/16" (1265mm)

Optional Roof Curb

Installation Instructions

(See FIGURE 8)

Filter racks and filters are optional equipment. Filters are 2" and may be either dispos-

able, permanent aluminum, or pleated disposable.

5.0 Mechanical

5.1.1 Filter Rack and Filters, Option AW7, AW9, or AW11

The curb is shipped unassembled. Field assembly and mounting on the roof are the

responsibility of the installer. Hardware to assemble the corners is supplied, Before

installing the roof curb, verify that the size is correct for the cabinet being installed.
1. Position the curb cross rails and curb side rails as shown in FIGURE 5. Fasten

curbing pieces at all corners with bolts and lag screws as shown in the Corner

Detail illustration.

2. Check the assembly for squareness. Adjust the roof opening so that the diagonal

measurements are equal within a tolerance of ± 1/8" (3mm).

3. Level the roof curb. To ensure a good weathertight seal between the integral curb

cap and the roof curb, the roof curb must be leveled in both directions with no twist

end to end. Shim level as required and secure curb to roof deck before proceeding

with flashing.

4. Install field-supplied flashing (See Curb Detail in FIGURE 5).

5. Before placing the unit on the curb, apply furnished 1/4" x 1-1/4" foam sealant tape

to the top surface of the curb, making good butt joint at the corners. The cabinet

must be sealed to the curb to prevent water leakage into the curb area due to

blown rain and capillary action.

5.1 Unit Inlet Air