beautypg.com

Reznor VCT Unit Installation Manual User Manual

Page 44

background image

44

Step 5: Fit the new air pressure switch ensuring
the tubes are connected as shown below.

Step 6: Re-connect wiring.

Step 7: Test product and close access door.


7.3 Gas Valve Replacement

Step 1:
Remove the burner assembly as
described in the Servicing section.

Step 2: Open the rear access door.

Step 3: Remove the two securing screws
(arrowed) from the base of the injector tube,
noting earth terminal connection.

Step 4: Remove the gas valve wiring
connections, noting their positions.

Step 5: Remove the four screws (arrowed)
securing the gas valve inlet plate to the burner
housing and remove plate.

Step 6: Remove gas valve rearwards as shown.


Step 7: The jet carrier and gas inlet can now be
detached from the gas valve.

Step 8: Replace gas valve

Step 9:
Re-connect wiring.

Step 10: Set burner pressure.

Step 11: Test product and close access door.

This manual is related to the following products: