beautypg.com

Reznor VCT Unit Installation Manual User Manual

Page 35

background image

35

Check installation has

been carried out to these

instructions.

NO

YES

Ensure gas and electricity

supplies are isolated.

Disconnect gas hose from

burner

Remove burner from tube and inspect burner head.

(See servicing instructions)

Replace burner on tube

and secure.

Open control housing and

check that all components

are securely fastened.

Reconnect gas hose.

Open Manual valve.

Check soundness.

Check thermostat is set to

maximum and is calling

for heat.

Switch on electrical supply.

The red neon should now

be illuminated. If restarting

heater a delay of 15sec

should be allowed.

A successful ignition is indicated

by the amber light illuminating

and remaining illuminated.

The heater should now

run through its start up

sequence and ignite.

Turn off power and check

that all components are

securely fastened.

Has the

burner lit?

Check operation on flame failure.

Check gas pressure.

Check gas pressure.

Close control housing

Leave the instructions

with a responsible person.

Check operation of

air pressure switch.

Commissioning chart

This manual is related to the following products: