Reznor VPT Unit Installation Manual User Manual
Page 5

5
Figure 2 Clearance to Combustibles (Standard indoor reflectors).
The minimum clearances to combustible materials are given in the tables below. These
minimum distances MUST be adhered to at all times. Adequate clearance MUST be provided
around air openings into the combustion chamber and there MUST be suitable clearance for
accessibility and for combustion / ventilating air supplies.
C2
C1
A
B1
B
B
A
E
D2
0° to 55°
D1
E
ns
ur
e th
at t
he
re
is
adequate
pr
ov
is
io
n i
n th
e b
ui
lding
for
co
m
bu
sti
on
an
d v
en
til
ation
air
su
pp
ly
. In
sta
llati
on
m
ust meet
m
in
im
um
re
qu
ir
em
en
ts and
appliciable
cod
es
.
B
urn
er
en
d.
Ou
tle
t en
d.
A
n
g
led
view
.
E
n
d
vie
w.
C3
Below
he
ate
r
Side
ve
nte
d
Side
un
ve
nte
d
End
un
ve
nte
d
Above o
utl
et
un
ve
nte
d
Above
R
ef
lect
or
Above
Burner
Service
distance
R
et
ur
n
en
d
on
U
tu
be
h
ea
te
r
C2
C1
A
B1
B
B
A
E
D2
0° to 55°
D1
En
su
re
th
at
th
er
e i
s
ad
eq
ua
te
provision i
n the
bu
ild
in
g
f
o
r
co
m
bu
st
io
n
an
d
ve
nti
lat
ion
ai
r
su
pp
ly
. I
ns
ta
lla
tion
mu
st
me
et
m
in
im
um
r
eq
uir
em
en
ts
an
d
appliciabl
e
c
o
d
e
s
.
B
urner e
n
d.
O
utl
et end.
A
n
g
le
d
vi
ew
.
End
view.
C3
B
el
ow
h
e
a
ter
S
ide
v
ent
ed
S
ide
u
nvente
d
En
d
u
nvente
d
A
bove outl
et
u
nvente
d
A
bo
ve
R
efl
e
ctor
A
bo
ve
B
u
rne
r
S
er
v
ice
d
istan
ce
R
etu
rn end o
n
U
t
u
b
e
he
at
er
WARNING!
a
p
p
lica
b
le
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)