Reznor VPT Unit Installation Manual User Manual
Page 36

36
Do the amber lights
remain illuminated after 15
seconds?
NO
YES
Does the burner spark?
YES
NO
CHECK: -
1. Spark gap correct (7/64" ± 1/64").
2. Ignition controller.
3. Transformer.
4.Intergrity of appliance ground connection.
5. Probe leads connected / integrity
CHECK: -
1. Gas valve On / Off switch set to On.
2. Integrity of electrical connections.
3. Integrity of appliance ground connection.
4. Manifold pressure.
5. Supply pressure.
6. Probe leads connected / integrity.
7. Flame sensor probe clean.
8. Hose connection to pressure switch.
9. Air inlet, outlet, and emitter tubes for
obstructions.
END
If the heater still fails to operate
correctly, contact your local
representative.
To aid in the trouble shooting process
the UT controller has an LED flash code
diagnostic sequence:
Steady Off No control Power
Steady On Power Applied, Control OK
1 Flash
Combustion Pressure Switch Open With Blower On
2 Flashes Combustion Pressure Switch Closed With Blower Off
3 Flashes Lockout From The Three Ignition Trials
4 Flashes Lockout From Five Flame Losses
5 Flashes Control Hardware Fault Detected
6 Flashes Lockout From Five Pressure Switch Losses
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)