Page 18

background image

LAARS Heating Systems

Page 18

NOTE: This appliance must be installed in a closed

pressure system with a minimum of 12 psi (82.7kPa)

static pressure at the boiler.

Hot water piping should be supported by suitable

hangers or floor stands. Do not support piping with

this appliance. Due to expansion and contraction of

copper pipe, consideration should be given to the type

of hangers used. Rigid hangers may transmit noise

through the system resulting from the piping sliding in

the hangers. It is recommended that padding be used

when rigid hangers are installed. Maintain 1" (2.5cm)

clearance to combustibles for hot water pipes.

Pipe the discharge of the relief valve (full size)

to a drain or in a manner to prevent injury in the event

of pressure relief. Install an air purger, an air vent,

a diaphragm-type expansion tank, and a hydronic

flow check in the system supply loop. Minimum fill

pressure must be 12psig (82.7kPa). Install shutoff

valves where required by code.

Suggested piping diagrams are shown in Figures

4, 5, 6, 7 and 8. These diagrams are meant only as a

guide. Components required by local codes must be

properly installed.

4A.2 Cold Water Make-Up — Boiler

1. Connect the cold water supply to the inlet

connection of an automatic fill valve.

2. Install a suitable back flow preventer between the

automatic fill valve and the cold water supply.

3. Install shut off valves where required.

NOTE: The boiler, when used in connection with a refrigeration

system, must be installed so the chilled medium is piped in parallel

with the boiler with appropriate valves to prevent the chilled

medium from entering the boiler.

The boiler piping system of a hot water heating

boiler connected to heating coils located in air

handling appliances where they may be exposed to

refrigerated air circulation must be equipped with flow

control valves or other automatic means to prevent

gravity circulation of the boiler water during the

cooling cycle.

A boiler installed above radiation level, or as

required by the authority having jurisdiction, must be

provided with a low water cutoff device either as a part

of the boiler or at the time of boiler installation.

4A.3 Water Flow Requirements — Boiler

A hydronic heating (closed loop) application

recirculates the same fluid in the piping system. As a

result, no new minerals or oxygen is introduced into

the system. To ensure a proper operating temperature

leading to long boiler life, a flow rate has been

established based on the fluid temperature rise for this

specific size boiler.

Pump-mounted boilers can be ordered for use in

primary secondary piping systems. The pumps used

are sized for the headloss through the heater, plus 30

4. Run gas supply line in accordance with all

applicable codes.

Note: If you have a boiler/water heater with a

normally open vent valve, install a vent line from

the vent valve to an outside location as required

by your installation code or IRI requirement. Do

not remove 3/4 inch pipe plug from the vent

valve if venting from the normally open vent

valve is not required by your installation code.

5. Locate and install manual shutoff valves in

accordance with state and local requirements.

6. A sediment trap must be provided upstream of

the gas controls.

7. All threaded joints should be coated with

piping compound resistant to action of liquefied

petroleum gas.

8. The appliance and its individual shutoff valve

must be disconnected from the gas supply piping

during any pressure testing of that system at test

pressures in excess of 1/2 PSIG (3.45kpa).

9. The unit must be isolated from the gas supply

system by closing its individual manual shutoff

valve during any pressure testing of the gas

supply piping system at test pressures equal to or

less than 1/2 PSIG (3.45kpa).

10. The appliance and its gas connection must be

leak tested before placing it in operation.

11. Purge all air from gas lines.

WARNING:

Open flame can cause gas to ignite and result in

property damage, severe injury, or loss of life.

NOTE: The Rheos appliance and all other gas

appliances sharing the gas supply line must be firing

at maximum capacity to properly measure the inlet

supply pressure. The pressure can be measured at

the supply pressure port on the gas valve. Low gas

pressure could be an indication of an undersized

gas meter, undersized gas supply lines and/or an

obstructed gas supply line. A bleed line from the

diaphragm-type automatic valve shall be vented per

local code requirements. Rheos units are equipped

with low and high gas pressure switches that are

integrally vent limited. These types of devices do not

require venting to atmosphere.

SECTION 4A.

Water Connections — Rheos Boiler

4A.1 Heating System Piping:

Hot Supply Connections — Boiler