beautypg.com

Laars heating systems, Page 12 system, Return system supply – LAARS Rheos RHCV - Install and Operating Manual User Manual

Page 12: System return system supply

background image

LAARS Heating Systems

Page 12

SYSTEM

BOILER CIRC.
PUMP

SYSTEM PUMP

THERMOMETER

GLOBE VALVE

CHECK VALVE

PRESSURE REDUCING VALVE
W/ FAST FILL BYPASS

EXPANSION TANK
WITH AIR SCOOP AND
AUTO AIR VENT

PUMP

LEGEND

VALVE

TEMPERATURE
SENSOR

3-WAY VALVE

PURGE
VALVE

C

COLD WATER

MAKE-UP

OPTIONAL PUMP MOUNTED UNIT AVAILABLE

C

RETURN

SYSTEM

SUPPLY

INSTALL AIR VENTS AT HIGH POINTS IN SYSTEM
PIPING & SIZING OF EXPANSION TANK
PER TANK MANUFACTURER'S INSTRUCTIONS

PRIMARY/SECONDARY MANDITORY FOR ALL
VARIABLE FLOW SYSTEMS

DIMENSION ''C'' TO BE 4 PIPE DIAMETERS

BOILER CIRC. PUMP SIZED FOR FLOW THROUGH BOILER

BOILER CIRC. PUMP TO BE USED WITH EM

DOTTED DEVICES INDICATE ALTERNATE LOCATIONS

BOILER CIRCUIT PIPING MUST BE EQUAL TO
BOILER WATER CONNECTION SIZE

SYSTEM TEMP. INTERLOCK REQUIRED

MULTIPLE STAGE BOILERS RECOMMENDED

2

CAUTION: THIS DRAWING SHOWS SUGGESTED
PIPING CONFIGURATION AND VALVING. CHECK
WITH LOCAL CODES AND ORDINANCES FOR
ADDITIONAL REQUIREMENTS.

D

D

DIMENSION ''D'' TO BE 18" MINIMUM

THERMOMETER

GLOBE VALVE

CHECK VALVE

PRESSURE REDUCING VALVE
W/ FAST FILL BYPASS

EXPANSION TANK
WITH AIR SCOOP AND
AUTO AIR VENT

PUMP

LEGEND

VALVE

TEMPERATURE
SENSOR

3-WAY VALVE

PURGE
VALVE

SYSTEM

RETURN

SYSTEM

SUPPLY

INSTALL AIR VENTS AT HIGH POINTS IN SYSTEM
PIPING & SIZING OF EXPANSION TANK
PER TANK MANUFACTURER'S INSTRUCTIONS

PRIMARY/SECONDARY MANDITORY FOR ALL
VARIABLE FLOW SYSTEMS

BOILER CIRC. PUMP SIZED FOR FLOW THROUGH BOILER

BOILER CIRC. PUMP TO BE USED WITH EM

DOTTED DEVICES INDICATE ALTERNATE LOCATIONS

BOILER CIRCUIT PIPING MUST BE EQUAL TO
BOILER WATER CONNECTION SIZE

SYSTEM TEMP. INTERLOCK REQUIRED

MULTIPLE STAGE BOILERS RECOMMENDED

2

CAUTION: THIS DRAWING SHOWS SUGGESTED
PIPING CONFIGURATION AND VALVING. CHECK
WITH LOCAL CODES AND ORDINANCES FOR
ADDITIONAL REQUIREMENTS.

BOILER CIRC.
PUMP

C

A

B

T1

ADJUSTMENT PROCEDURE TO MAINTAIN 130° F INLET TEMP.
1. Turn on heater and open valves A & B

3. If T1 is greater than 130° F, slowly

close valve A until T1 drops to 130° F

4. Check after system operating temperature has

2. After steady-state operation, if T1 is less than

130° F, slowly close valve B until T1 climbs to 130° F

stabilized. Make final adjustments

OPTIONAL PUMP MOUNTED

UNIT AVAILABLE

COLD WATER

MAKE-UP

SYSTEM PUMP

B

C

A

B

T1

D

D

DIMENSION ''C'' TO BE 4 PIPE DIAMETERS
DIMENSION ''D'' TO BE 18" MINIMUM

Figure 4. Hydronic Piping — Multiple Boilers, Primary Secondary System.

Figure 5. Hydronic Piping — Multiple Boilers, Low Temperature System.

This manual is related to the following products: