beautypg.com

Carrier AQUAZONE 50VQP084-300 User Manual

Page 47

background image

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

PC 111

Catalog No. 536-203

Printed in U.S.A.

Form 62AQ-1SI

Pg CL-1

7-99

Replaces: New

Book

1

1

1

4

4

4

Tab

1a 1b 5a 5a 6a 6b

CL-1

50VQP

START-UP CHECKLIST

CUSTOMER:___________________________

JOB NAME: _______________________________________

MODEL NO.:___________________________

SERIAL NO.:____________________

DATE:_________

I. PRE-START-UP

DOES THE UNIT VOLTAGE CORRESPOND WITH THE SUPPLY VOLTAGE AVAILABLE? (Y/N)

HAVE THE POWER AND CONTROL WIRING CONNECTIONS BEEN MADE AND TERMINALS

TIGHT? (Y/N)

HAVE WATER CONNECTIONS BEEN MADE AND IS FLUID AVAILABLE AT HEAT EXCHANGER?

(Y/N)

HAS PUMP BEEN TURNED ON AND ARE ISOLATION VALVES OPEN? (Y/N)

HAS CONDENSATE CONNECTION BEEN MADE AND IS A TRAP INSTALLED? (Y/N)

IS AN AIR FILTER INSTALLED? (Y/N)

II. START-UP

IS FAN OPERATING WHEN COMPRESSOR OPERATES? (Y/N)

IF 3-PHASE SCROLL COMPRESSOR IS PRESENT, VERIFY PROPER ROTATION PER INSTRUCTIONS.

(Y/N)

UNIT VOLTAGE — COOLING OPERATION

PHASE AB VOLTS

PHASE BC VOLTS

PHASE CA VOLTS

(if 3 phase)

(if 3 phase)

PHASE AB AMPS

PHASE BC AMPS

PHASE CA AMPS

(if 3 phase)

(if 3 phase)

CONTROL VOLTAGE

IS CONTROL VOLTAGE ABOVE 21.6 VOLTS? (Y/N)

.

IF NOT, CHECK FOR PROPER TRANSFORMER CONNECTION.

TEMPERATURES

FILL IN THE ANALYSIS CHART ATTACHED.

COAXIAL HEAT

EXCHANGER

COOLING CYCLE:

FLUID IN

C FLUID OUT

C

kPa

L/s

HEATING CYCLE:

FLUID IN

C FLUID OUT

C

kPa

L/s

AIR COIL

COOLING CYCLE:

AIR IN

C AIR

OUT

C

HEATING CYCLE:

AIR IN

C

AIR OUT

C