6 after installation, After installation – Cisco 7200 VXR User Manual
Page 36
36
6
After Installation
This section contains hardware replacement instructions. The PC card or Flash memory card, CompactFlash Disk, Flash Disk,
GBIC, SFP, and port adapters support online insertion and removal (OIR).
These topics are covered in this section:
•
Replace the Network Processing Engine or Network Services Engine, page 36
•
Replace the I/O Controller, page 37
•
Replace the PC Card, Flash Memory Card, Flash Disk, CompactFlash Disk, or USB Token, page 38
•
Replace the Gigabit Interface Converter, page 39
•
Replace a Port Adapter or Service Adapter, page 41
•
Replace the Port Adapter Jacket Card, page 42
•
Replace the Power Supply, page 44
Note
When powering off or powering on the router, wait a minimum of 30 seconds before powering it on or off again.
Replace the Network Processing Engine or Network Services Engine
Figure 18
Replacing the Network Processing Engine or Network Services Engine
Caution
If you are installing an NPE-G1, you must copy your saved configuration to a Flash Disk or PC Card or to a TFTP
server before you install the NPE-G1. If you have a C7200-I/O-2GE/E or C7200- I/O-2FE/E I/O controller installed,
copy the saved configuration only to a Flash Disk or TFTP server.
Step 1
Power down the router.
Step 2
Disconnect the router from the power source.
Step 3
If you have an NPE-G1 installed, remove the cables and cable-management brackets. See Figure 6 and Figure 9.
Step 4
On the network processing engine (NPE) or network services engine (NSE) (1), unscrew the captive installation
screws (2).
1
Network processing engine or network services engine
2
Captive installation screws
57014
NETWORK PROCESSING ENGINE-300
1
2
2