INSTALLATION

2-11

2.10.11 FAULT RELAY

The f ault r elay is a s ingle pol e do uble thr ow

(SPDT) relay ha ving a normally op en and

normally c losed s et of r elay c ontacts that ar e

rated for 5 am ps at 12 0 VAC and 5 amps at 30

VDC. T he r elay e nergizes whe n an y f ault

condition occurs and remains energized until the

fault is c leared an d th e CLE AR button is

depressed. T he f ault r elay c onnections ar e

shown in Figure 2-11.

2.11 AUXILIARY RELAY CONTACTS

Each Bo iler is equ ipped w ith a s ingle po le

double t hrow ( SPDT) r elay th at is ener gized

when th ere is a dem and f or heat and de-

energized after the d emand for heat is satisfied.

The relay is provided for the control of auxiliary

equipment, such as pumps and louvers, or c an

be used as a Boiler status indictor (firing or not

firing). Its contacts are rated for 120 VAC @ 5

amps. Ref er to F igure 2- 11 t o l ocate the AUX

RELAY terminals for wiring connections.

2.12 FLUE GAS VENT INSTALLATION

The minimum allo wable vent diam eter f or a

single Benchmark 3.0 Boiler is 8 inches.

The AERCO Benchmark Ventin g a nd

Combustion Air G uide, GF-2050, m ust be

consulted bef ore an y f lue gas ven t or in let air

venting is des igned or i nstalled. U/ L l isted,

positive pr essure, watertight v ent m aterials as

specified in AERCO’s G F-2050, m ust be us ed

for safety and code compliance. Since the unit is

capable of discharging low temperature exhaust

gases, h orizontal s ections of the f lue vent

system must be pitc hed bac k to the unit a

minimum of 1/4 inc

h per f oot to

avoid

condensate po oling a nd allo w f or pr oper

drainage.

The c ombined pr essure dr op of ve nt a nd

combustion air s ystems must not ex ceed 1 40

equivalent feet of 8 inch ducting. Fittings as well

as pipe lengths must be calculated as part of the

equivalent length.

For a n atural draft installation the draft must not

exceed ±0.25 inch W.C. These f actors must be

planned i nto t he vent ins tallation. If the

maximum allowable equivalent lengths of piping

are exceeded, the unit will not oper ate properly

or reliably.

For Mas sachusetts boiler ins tallations, t he

Heatfab D ivision of the Se lkirk Cor poration

provides vent s ystems whic h c onform to all

applicable r equirements for ins tallations within

the C ommonwealth of Ma ssachusetts. Con tact

information for this supplier is as follows:
Selkirk Corporation

Heatfab Division

130 Industrial Blvd.

Turners Falls, MA 01376

Phone: 1-800-772-0739

www.heat-fab.com

2.13 COMBUSTION AIR

The AERCO Be nchmark Venting and C ombus-

tion Air G uide, G F-2050 MUST be c onsulted
before

any flue or combustion supply air venting

is des igned or im plemented. C ombustion a ir

supply is a d irect r equirement of ANSI 22 3.1,

NFPA-54, and local codes. These codes should

be c onsulted bef ore a p ermanent des ign is

determined.
The c ombustion a ir m ust be f ree of c hlorine,

halogenated h ydrocarbons, or other c hemicals

that can become hazardous when used in gas-

fired eq uipment. Com mon s ources of t hese

compounds ar e s wimming poo ls, de greasing

compounds, plastic processing and refrigerants.

Whenever the environment contains these types

of c hemicals, c ombustion air m ust be s upplied

from a c lean area out doors f or the pr otection

and longevity of the equipment.

The AER CO Benchmark 3.0 Boiler is U L listed

for 100% s ealed c ombustion. It c an als o be

installed us ing r oom air , provided ther e is an

adequate s upply. ( See p aragraph 2.1 3.3 f or

more information concerning sealed combustion

air). If the s ealed c ombustion air op tion is no t

being used, an in let s creen will b e at tached at

the air inlet on the top of the unit
The more c ommon methods of s upplying

combustion air are o utlined b elow. F or m ore

information c oncerning c ombustion air , c onsult

the

AERCO B

enchmark Ventin

g an

d

Combustion Air Guide, GF-2050.

2.13.1 Combustion Air From Outside the
Building

Air s upplied f rom outs ide the building m ust be

provided through two permanent openings. Each

opening must have a free area of not less than

one s quare i nch f or eac h 4000 BTU/H bo iler

input. T he f ree ar ea m ust tak e into ac count

restrictions such as louvers and bird screens.