Gf-123, Benchmark 2.0ln low nox boiler – AERCO BMK 2.0 LN October 2012 User Manual
Page 95

GF-123
Benchmark 2.0LN Low NOx Boiler
Chapter 7
OMM-0046_0F
I
nstallation, Operation and Maintenance Manual
Maintenance
PR1 10/17/12
AERCO International Inc.● 100 Oritani Dr. ● Blauvelt, NY 10913. ● Ph: 800-526-0288
Page 95 of 172
Figure 7-7: External Condensate Trap
7.8 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF TIME
If the boiler is to be taken out of service for an extended period of time (one year or more), the
following instructions must be followed.
1. Set ON/OFF switch on the front panel to the OFF position to shut down the boiler’s
operating controls.
2. Disconnect AC power from the unit.
3. Close the water supply and return valves to isolate boiler.
4. Close external gas supply valve.
5. Open relief valve to vent water pressure.
7.9 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED
SHUTDOWN
After a prolonged shutdown (one year or more), the following procedures must be followed:
1. Review installation requirements included in Chapter 2.
2. Inspect all piping and connections to the unit.
3. Inspect exhaust vent, air duct (if applicable).
4. Perform initial startup per Chapter 4.
5. Perform safety device testing and scheduled maintenance procedures per Chapters 6 and 7
of this manual.