beautypg.com

Hangar 9 3.1m Sukhoi SU-26MM ARF (3 Boxes) User Manual

Page 27

background image

27

Hangar 9 3.1m Sukhoi SU-26MM ARF Assembly Manual

11. To help prevent the line from going back inside the

cowl, open up the fuel line with use of hemostat and pull

over the overflow line.

Ignition Module, battery, Regulator

and Switch Installation

Required Parts

Fuselage

Required Parts (not included)

JR 5203 regulator

Ignition Module

Ignition Battery, 2000 2-cell Spektrum
JR heavy-duty switch or similar
JR heavy-duty 6-inch extension

Required Tools and Adhesives

Hobby knife

Iron

Masking tape

Medium CA

Hook and loop

Double-sided tape

1. Locate the ignition switch cut out in the right front of

the fuselage and remove the covering. Mount the ignition

switch.

2. Locate the slots for the ignition module behind the

cowl mounting ring and remove the covering.

3. Iron down the edges and the covering on the engine

box.

4. The ignition module and battery will be installed as one

piece, on top of each other. Apply masking tape to both sides

of battery and bottom side of ignition module.