4 installation guide, 1 preparations – COP-USA CD59NV-IR35YK User Manual
Page 11

10
4 Installation Guide
4.1 Preparations
1) Basic Requirements
All the electric work must be finished under the latest electric & fire prevention
law and rules (and any related law and rules). Please check according to the
packing list if every accessory is included. And also make sure the installation is
operated as required. Please contact us for any help during the installation.
2) Installation Space and Density Checkup
Please make sure the space is big enough to install our dome. And also ensure
the density of the
ceilings or walls
to hold total
weight of the
dome and its accessories.
3) Cables Preparation
Please choose the proper cable according to the transmission distance. The min
requirement of coaxial BNC cable is listed as follows for reference:
Camera Module
Auto Compatible SONY,LG,Samsung,CNB,HITACH,etc.
Baud Rate
2400/4800/9600bps
Operating Humidity 0~90%
Operating Temp
‐35
o
~ +60
o
C
Models
Max Distance(Feet\Meter)