beautypg.com

4 installation guide, 1 preparations – COP-USA CD59NV-IR35YK User Manual

Page 11

background image





10


 

4 Installation Guide 

 
4.1 Preparations 
 

1) Basic Requirements 
 
All the electric work must be finished under the latest electric & fire prevention 
law and rules (and any related law and rules). Please check according to the 
packing list if every accessory is included. And also make sure the installation is 
operated as required. Please contact us for any help during the installation. 
 
     
2) Installation Space and Density Checkup 
Please make sure the space is big enough to install our dome. And also ensure 

the density of the 
ceilings or walls 
to hold total 
weight of the 

dome and its accessories. 

 

3) Cables Preparation 

Please choose the proper cable according to the transmission distance. The min 

requirement of coaxial BNC cable is listed as follows for reference: 

Camera Module 

Auto Compatible SONY,LG,Samsung,CNB,HITACH,etc. 

Baud Rate 

2400/4800/9600bps 

Operating Humidity  0~90% 

Operating Temp 

‐35

o

~ +60

o

Models 

Max Distance(Feet\Meter)