beautypg.com

WEATHER GUARD Model 216-5 All-Purpose Rack, Steel, Full-Size, 3 Cross Member User Manual

Assembly and installation instructions, Warning, Caution

background image

ASSEMBLY AND INSTALLATION INSTRUCTIONS

All Purpose Rack - Models 205 • 215 • 216 • 2055 • 2056

Rev. 6/05 Part No. 24-0224

TOOLS REQUIRED

7/16" Open or Box End Wrench
9/16" Open or Box End Wrench

NOTE: We have found varying
tolerances between the top of
the doors and the rain gutters
on the 1992 to present full-size
vans. Before placing van rack on
vehicle, check the door clear-
ance with the bottom clamp, by
holding it to the underside of the
rain gutter and slowly opening
the door. If the door hits, you
will have to move the clamp to
where more clearance is avail-
able. Some cases may require
moving the clamps rearward of
the driver and passenger side
doors.

Figure 1. Model 205 All Purpose Rack shown installed

WARNING

This product is only intended for, and only safe for, transporting
ladders, lumber, pipe and other similar materials. It is the respon-
sibility of the user to secure these materials to the rack before
transporting. Any modifications made to this product, or use of
this product for any other purpose than its intended use, could
create a hazardous condition that can cause serious personal
injury or property damage.

IMPORTANT

BEFORE YOU BEGIN

Read these instructions and
warnings completely before
installation.

Model

205

215

2055

216

2056

Description

Bolt Kit

32-0146

32-0147

32-0148

Quan.

8

12

4

1/4-20 x 1-1/2" Carriage Bolt

8

12

4

1/4-20 Nylon Lock Nut

8

12

4

1/4" Flat Washer

7

10

3

3/8-16 x 3/4" Thread Cutting Bolt

BOLT KITS

The following bolt kits are provided with each model. Check
the bolt kit to be sure the following parts are included:

The distinctive, trademarked RED TIPS
are your assurance of WEATHER
GUARD® Equipment quality.

CAUTION

Load should be approximately centered
front to rear on all vehicles. Failure to do
this will cause damage to the vehicle roof.

Approximate Assembly and Installation time:

205: 36 min. per unit (.6 hrs.)

215 & 216: 48 min. per unit (.8 hrs.)

2055 & 2056: 18 min. per unit (.3 hrs.)

Depending on van equipment installation experience

8

12

4

1/4-20 x 1" Carriage Bolt