Installation, Wiring – Pilz PNOZ s1 C 24VDC 2 n/o User Manual
Page 5
![background image](/manuals/647235/5/background.png)
PNOZ s1
Operating Manual PNOZ s1
21393-EN-07
5
Installation
Install base unit without contact expansion module:
}
Ensure that the plug terminator is inserted at the side of the unit.
Connect base unit and PNOZsigma contact expansion module:
}
Remove the plug terminator at the side of the base unit and at the contact expansion
module.
}
Connect the base unit and the contact expansion module to the supplied connector be-
fore mounting the units to the DIN rail.
Installation in control cabinet
}
The safety relay should be installed in a control cabinet with a protection type of at least
IP54.
}
Use the notch on the rear of the unit to attach it to a DIN rail (35 mm).
}
When installed vertically: Secure the unit by using a fixing element (e.g. retaining brack-
et or end angle).
}
Push the device upwards or downwards before lifting it from the DIN rail.
Wiring
Please note:
}
Information given in the "Technical details" must be followed.
}
The outputs 13-14, 23-24 are safety contacts.
}
Semiconductor output Y32 should
not be used for safety circuits!
}
To prevent contact welding, a fuse should be connected before the output contacts (see
technical details).
}
Calculation of the max. cable length l
max
in the input circuit:
R
lmax
R
l
/ km
I
max
=
R
lmax
= max. overall cable resistance (see technical details)
R
l
/ km = cable resistance/km
}
Use copper wire that can withstand 60/75 °C.
}
Sufficient fuse protection must be provided on all output contacts with capacitive and in-
ductive loads.