beautypg.com

Performing a pressure switch test – Rice Lake Condec 3030 User Manual

Page 18

background image

Figure 9

7. Performing a Pressure Switch Test

Figure 10

To perform a switch test, follow these steps:

1. Change the setup to Setup 4 (default switch test).

Setup 4: The upper display is set to [P1] ST, all other displays
are off.

16