2 front panel configuration, Front panel configuration – Rice Lake CB-2 Concrete Batch Controller Version 1.0 User Manual
Page 22

18
CB-2 Automated Concrete Batching System Installation/Operation Manual
Figure 3-1. iRev Hardware Configuration Display
To use
iRev
, do the following:
1. Install
iRev
on an IBM-compatible personal computer. See XX for detailed hardware and software
requirements.
2. With both indicator and PC powered off, connect the PC serial port to the RS-232 pins on the indicator
serial port.
3. Power up the PC and the indicator. Use the setup switch to place the indicator in setup mode.
4. Start the
iRev
program.
iRev
provides online help for each of its configuration displays. Parameter descriptions provided in this manual for
front panel configuration can also be used when configuring the indicator using
iRev
: The interface is different, but
the parameters set are the same.
See the 920i Installation and Operation Manual, PN 67887 for more information about using
iRev
to configure the
920i
.
3.1.2
Front Panel Configuration
Use the CONFIG submenu under the SCALES menu to configure A/D scales. For example, in an indicator with
a single-channel A/D card installed in Slot 1, the Scale Configuration display will show the A/D listed (
Slot 1
Channel 1
) under the
AVAILABLE A/D’s
column. Use the
left
navigation key to select the A/D, then press the center
softkey,
Add
. The A/D is then moved to the Associated A/D’s column. If no other A/D’s are listed in the
AVAILABLE A/D’s
column, the center softkey changes to
Done
, as shown in Figure 3-2. Press
Done
to exit the Scale
Configuration display.
Figure 3-2. Scale Configuration Display