Rice Lake CB-2 Concrete Batch Controller Version 1.0 User Manual
Cb-2, Installation/operation manual, Automated concrete batching system
Table of contents
Document Outline
- About This Manual
- 1.0 Introduction
- 2.0 Installation
- 2.1 Important Notes
- 2.1.1 Two Power Sources
- 2.1.2 I/O Power and Manual Panel Same Phase Power
- 2.1.3 Unused Inputs Must be Jumpered to 120V
- 2.2 CB-2 Main Junction Block
- 2.3 Load Cells
- 2.3.1 Serial Communications
- 2.4 Digital I/O
- 2.5 Fuse Replacement
- 2.6 Battery Replacement
- 2.7 Replacement Parts
- 2.7.1 Option Cards
- 2.8 Installing an Optional PS-2 Keyboard
- 3.0 Configuration of Scale Parameters
- 4.0 Configuration of User Parameters
- 5.0 Calibration
- 6.0 Utilities
- 6.1 Material Usage
- 6.1.1 Usage Reports
- 6.1.2 Adjust Inventory
- 6.1.3 Clear Day Totals through Yearly Totals
- 6.2 Tune Plant
- 6.2.1 Min. Drop Screen
- 6.2.2 Tune Jogs Screen
- 6.3 Reports
- 6.3.1 Print Mix Designs
- 6.3.2 Print Application Parameters
- 6.3.3 Print Diagnostics
- 6.4 Diagnostics
- 6.4.1 Test Inputs
- 6.4.2 Test Outputs
- 6.4.3 Test Ticket Printer
- 6.4.4 Test Report Printer
- 6.4.5 Test Serial Ports
- 6.4.6 Print Diagnostics
- 6.4.7 Clear Diagnostics
- 7.0 EZ Change Criticals
- 8.0 Batching
- 9.0 Front Panel
- 10.0 CB-2 Simulation Mode
- CB-2 Limited Warranty