February 2014
13-Jamb-Mullion-Installation
1-866-Oldcastle (653-2278) www.oldcastlebe.com
2.0 a. Insert "F" or"T" Anchor into the top and bottom of the
mullions before erecting them as shown in FIGURE 2.0a.
b. Erect and locate jamb and vertical mullions and
temporarily attach them to structure. (Install plumb & true)
c. Field Drill holes in "F" or "T" Anchor for appropriate
fastener according to approved shop drawings.
d. Shim and Anchor into opening.
e. Apply Dow Corning 795 or Tremco Proglaze SSG silicone
sealant to face, top, bottom and screw tracks of shear block
as shown in FIGURE 2.0b.
Apply Dow Corning 795
or Tremco Proglaze SSG
silicone sealant to face, top
bottom and screw tracks of
shear block as shown
Field Drill Typical
Field Drill Typical
JAMB AND MULLION INSTALLATION
FIGURE 2.0b
FIGURE 2.0a
RELIANCE STORMMAX HIGH PERFORMANCE INSTALLATION MANUAL