FIGURE 15
Type I Zone Plug Installation
STEP 1
Seal front and back gasket races, and adaptor
race. Tool sealant into races to insure proper
seal. Sealant should be applied from just above
horizontal leg down 1/2" into area for zone plug.
Tool sealant into joint between
mullion and horizontal from
exterior and interior of
glazing pocket
2.5 Apply sealant to all contact surfaces on vertical and horizontal mullions where zone plugs will be installed. Install
at the end of each horizontal mullion by sliding plug down into pocket from above. Tool sealant around all sides of the
zone plug in the glazing pocket to ensure a watertight seal.
SEE FIGURE 15 below & page 20 for System 1, SEE
FIGURE 16, page 21 for System 2 installation .