12 frame install, Frame installation – Oldcastle BuildingEnvelope Reliance-TC User Manual
Page 12
R E L I A N C E - T C C U R T A I N W A L L I N S T A L L A T I O N M A N U A L
TM
FRAME INSTALLATION
3"
C Mullion
L
Front View at Sill
13
16
"
1
1
16
"
Side View at Sill
FIGURE 6
Type I Shear Block Orientation
and Single Span Perimeter Anchor
1
2
"
5
16
"
2
1
4
"
5
16
"
2.1.2 Install verticals plumb and level. Place shims under vertical mullion and anchor at sill to evenly
distribute deadload from wall. Install pipe sleeve anchor at head to allow for thermal movement of the vertical
mullions. SEE FIGURE 7, page 13 .
Anchor type and sizes vary per job requirements. Details shown in these instructions are to be used as a guide only.
Refer to approved shop drawings for actual conditions.
2.1 Vertical mullion installation:
SINGLE SPAN INSTALLATION:
2.1.1 Attach shear blocks to all vertical mullions. The integral perimeter anchors are designed for use with
standard shear blocks. Note; the WW-104-01 anchor may not be used with Type II head or sill horizontals having an
"AW" part number. SEE FIGURE 6 for proper orientation and installation on mullion.NOTE: Depending on the end
reactions, either the integral perimeter anchor or tee anchors can be used to anchor the wall. For end
reactions above 750 pounds, use "T" anchors.
See approved shop
drawings for anchor
sizing
FS-9 shear block
fastener
This shim must not interfere with
the mullion end cap.
WW-181-01 shear block
WW-104-01 perimeter anchor can
not be used with System 2 head and
sill assemblies
Shear Block Orientation
at Horizontal
(Head & Sill Similar)
WW-181-01
Shear Block
WW-104-01
perimeter
anchor
MAY 2013
12