B.6 board installation, Vmp3 vmp1-io1 module – Kontron VMP3 User Manual
Page 143

VMP3
VMP1-IO1 Module
ID 29230, Rev. 01
© 2005 Kontron Modular Computers GmbH
Page B - 7
29230
.01.UG.VC.050727/091442
P R E L I M I N A R Y
B.6
Board Installation
In order to keep the installation process as simple and easy as possible please follow the rec-
ommended order of work:
1. Install the PMC module on the VMP1-IO1
2. Install the package (VMP1-IO1 plus PMC module) on the VMP3
PMC Module Installation
3. Place the EMC gasket on the bezel of your PMC module
4. Push the PMC bezel into the window of the front panel of the VMP3 and plug the connec-
tors together.
5. Use three screws (M2.5 x 6mm) to secure the module to the board
Installation of the VMP1-IO1 Module on the VMP3
6. Place the VMP1-IO1 exactly above the VMP3
7. Plug them together
8. Use 4 screws (2.5 x 6 mm) to secure the board to the VMP3
ESD Equipment!
Your carrier board and PMC module contain electrostatic sensitive
devices. Please observe the necessary precautions to avoid damage to
your board:
•
Discharge your clothing before touching the assembly. Tools must be
discharged before use.
•
Do not touch components, connector pins, or traces.
•
If working at an anti-static workbench with professional discharging
equipment, please do not omit to use it.