beautypg.com

Step 12- installing the control box – BoonDocker POLARIS: 2007-10 Dragon Pump Gas User Manual

Page 14

background image

BoonDocker Performance 1585 Hollipark Dr. Idaho Falls, ID 83401

Toll Free (US) 877-552-6127 or 208-542-4411 www.boondockers.com

Revised 10/01/2010

Page 14

Step 12- Installing the Control Box

Tools Needed: Parts Needed:

Air Saw Boondocker control box w/ Plug N play harness

Basic Tool Set

Transducer harness

Zip-ties

A. Remove the stock connector from motor side of the ECU and plug in the Boondocker Plug and
Play harness. Then reconnect the stock connector into the open end of the Boondocker Plug and
Play harness. (See picture)

B. Ground the eyelet from the Plug and Play harness to the bolt that is shown above. There are 2
locations to choose from be sure to use the one as shown. The other bolt is not a good ground
source. Tip: The good ground will already have a factory eyelet grounded to it. (See picture).

C. Locate the Transducer harness from the control box package. The 3 position connector with the
purple seal will connect to the Pressure Transducer installed later is Step 13. Route the end with
the 10 position white connector near the Plug and Play Harness this will later mount to the
Boondocker control box. Plug in the pink TPS wire from the Plug and Play to the pink TPS wire on
the Transducer harness (see picture on next page).