beautypg.com

Vermont Casting SDDVRBS User Manual

Page 16

background image

16

Stardance Direct Vent - Rear Vent Gas Heaters

20012950

ST131b

wall thimble

12/3/99 djt

61"

(1549mm)

ST131b

Fig. 20 Minimum wall thimble centerline.

6. Slip the wall plate and trim collar over the interior

end of the horizontal pipe and install into the wall
sleeve. Seal the joint inside the wall plate if needed
to keep cold air from being drawn into the home.

7. Connect the pipe to the inner collar. Fasten the wall

plate to the pipe with three sheet metal screws. Slide
the trim collar up against the wall plate to cover the
screws. (Figs. 18)

8. Install the vent terminal. (Figs. 18) Guide the inner

and outer vent termination collars into the adjacent
pipes. Double check that the vent pipes overlap the
collars by 2”. Fasten the termination to the wall with
the screws provided, and caulk the joint with weath-
erproof sealant.

Through Side Wall /

Vent Termination Below Grade

Refer to Figure 20 for minimum centerline of wall open-
ing.

1. Attach Inner Starter Pipe, (found in with the logset),

to the stove.
• Run a bead of sealant beneath the pipe bead and
attach to the stove using three 1/4-20 x 3/8” phillips
screws provided in the parts bag. (Fig. 21)

2. Dry fit the inner and outer pipe of the first elbow

directly to the starter pipe.

3. Dry fit the Inner pipe assembly to the stove for the

purpose of determining the center line of the pipe on
the wall.

Side Wall Terminations: Dry fit the outer elbow

with the vertical outer vent and confirm the centerline
alignment with the wall thimble opening.

�����
������������
���������������
����

Inner Flue Collar

Vent Starter Pipe

Seal all around

crimped end

Inner

Elbow

ST938

Fig. 21 Install inner starter pipe and inner elbow.

4. Attach the elbow to the starter pipe.

Run a bead of sealant about 1/2” from end of the

starter pipe and attach the assembly to the stove
using three 1/4-20 x 3/8” Phillips screws provided in
the parts bag. (Fig. 21)

5. Install the first elbow and secure using three sheet

metal screws. Insert the elbow over the stove flue
collar. Also, be sure to align holes on the pipe with
the holes on the flue collar of the firebox. Fasten the
pipe to the holes in the flue collar with the #12 x 1/2”
sheet metal screws provided. (Fig. 22)

�����
������������
����������
����

ST939

Fig. 22 Fasten outer pipe with #12 x 1/2” sheet metal screws.

Side Wall Termination Assembly

1. Locate the vent opening on the wall. Refer to Figure

20, to determine the minimum centerline of wall
opening. It may be necessary to first position the
stove and measure to find the hole location. De-
pending on whether the wall is made of combustible
materials, cut the opening to the size shown in Fig-
ure 23. Combustible wall openings must be framed
as shown in Figure 23.

2. Measure the wall thickness and cut the wall sleeve

sections to proper length (MAXIMUM 12”). Assemble
the sleeve with the #8 sheet metal screws supplied.