beautypg.com

Switch installation, Preparing for installation, Warnings – Cisco 3030 User Manual

Page 29: C h a p t e r, Chapter 2, “switch installation

background image

C H A P T E R

2-1

Cisco Catalyst Blade Switch 3030 Hardware Installation Guide

OL-8389-01

2

Switch Installation

This chapter provides instructions on how to install your Cisco Catalyst Blade Switch 3030—also
referred to as the switch module—in the Dell Modular Server Chassis and how to set up and configure
your switch module. The Dell Modular Server Chassis—also referred to as the server chassis—is a
system that supports up to ten server modules and up to four Ethernet switch modules. The switch
module is installed in one of the chassis I/O module bays on the rear panel of the server chassis.

This chapter also describes how to interpret the power-on self-test (POST) that ensures proper operation
and how to make connections to the switch.

Read the topics and perform the procedures in this order:

Preparing for Installation, page 2-1

Dell Modular Server Chassis Architecture, page 2-5

Installing the Switch Module into the Server Chassis, page 2-6

Installing and Removing SFP Modules, page 2-13

Connecting to the 10/100/1000 Ports, page 2-16

Connecting to SFP Modules, page 2-17

Where to Go Next, page 2-19

Preparing for Installation

This section covers these topics:

Warnings, page 2-1

Installation Guidelines, page 2-3

Verifying Package Contents, page 2-4

Warnings

These warnings are translated into several languages in the Regulatory Compliance and Safety
Information for the Cisco Catalyst Blade Switch 3030
that ships with the product. The EMC regulatory
statements are also included in that guide.