Integrated raid controller, Optional integrated raid controller (see, Activating the integrated raid controller – Dell PowerEdge 2650 User Manual
Page 46: Removing a hard drive from its carrier, Installing a hard drive on a carrier

1.
").
2.
If your replacement hard drive does not have a carrier, install the new drive on a carrier (see "
Installing a Hard Drive on a Carrier
").
3.
Open the hard-drive carrier handle (see
4.
Insert the hard-drive carrier into the drive bay (see
5.
Close the hard-drive carrier handle to lock it in place.
6.
").
7.
Install any required SCSI device drivers (see "Installing and Configuring SCSI Drivers" in the User's Guide for information).
8.
If the hard drive is new, run the SCSI controllers test in system diagnostics.
Removing a Hard Drive From Its Carrier
1.
Remove the hard drive from the system (see "
2.
Remove the four screws that secure the drive to the carrier (see
).
3.
Remove the hard drive from the carrier.
Figure 4-19. Removing a Hard Drive From its Carrier
Installing a Hard Drive on a Carrier
1.
Insert the replacement hard drive into the carrier (see
).
2.
Install the four screws that secure the drive to the carrier.
3.
Install the hard drive in the system (see "
Integrated RAID Controller
To activate the integrated RAID controller, you must install three components, the RAID controller memory module, hardware key, and battery.
Activating the Integrated RAID Controller
NOTICE:
When installing a hard drive, ensure that the adjacent drives are fully installed. Inserting a hard-drive carrier and attempting to lock its handle
next to a partially installed carrier can damage the partially installed carrier's shield spring and make it unusable.
NOTICE:
Not all operating systems support hot-plug drive installation. See the documentation supplied with your operating system.
NOTICE:
Do not insert a hard-drive carrier and attempt to lock its handle next to a partially installed carrier. Doing so can damage the partially installed
carrier's shield spring and make it unusable. Ensure that the adjacent drive carrier is fully installed.
CAUTION:
See "Protecting Against Electrostatic Discharge" in the safety instructions in your System Information document.
CAUTION:
See "Protecting Against Electrostatic Discharge" in the safety instructions in your System Information document.
CAUTION:
Before you perform this procedure, read the safety instructions in your System Information document.
CAUTION:
See "Protecting Against Electrostatic Discharge" in the safety instructions in your System Information document.