CL-1

50RTP

START-UP CHECKLIST

CUSTOMER:___________________________

JOB NAME: _______________________________________

MODEL NO.:___________________________

SERIAL NO.:____________________

DATE:_________

I. PRE-START-UP

DOES THE UNIT VOLTAGE CORRESPOND WITH THE SUPPLY VOLTAGE AVAILABLE? (Y/N)

HAVE THE POWER AND CONTROL WIRING CONNECTIONS BEEN MADE AND TERMINALS

TIGHT? (Y/N)

HAVE WATER CONNECTIONS BEEN MADE AND IS FLUID AVAILABLE AT HEAT EXCHANGER?

(Y/N)

HAS PUMP BEEN TURNED ON AND ARE ISOLATION VALVES OPEN? (Y/N)

HAS CONDENSATE CONNECTION BEEN MADE AND IS A TRAP INSTALLED? (Y/N)

IS AN AIR FILTER INSTALLED? (Y/N)

II. START-UP

IS FAN OPERATING WHEN COMPRESSOR OPERATES? (Y/N)

VERIFY PROPER ROTATION OF SCROLL COMPRESSOR PER INSTRUCTIONS. (Y/N)

UNIT VOLTAGE — COOLING OPERATION

PHASE AB VOLTS

PHASE BC VOLTS

PHASE CA VOLTS

PHASE AB AMPS

PHASE BC AMPS

PHASE CA AMPS

CONTROL VOLTAGE

IS CONTROL VOLTAGE ABOVE 21.6 VOLTS? (Y/N)

.

IF NOT, CHECK FOR PROPER TRANSFORMER CONNECTION.

TEMPERATURES

FILL IN THE ANALYSIS CHART ATTACHED.

COAXIAL HEAT

EXCHANGER

COOLING CYCLE:

FLUID IN

F

FLUID OUT

F

PSI

FLOW

HEATING CYCLE:

FLUID IN

F

FLUID OUT

F

PSI

FLOW

AIR COIL

COOLING CYCLE:

AIR IN

F

AIR OUT

F

HEATING CYCLE:

AIR IN

F

AIR OUT

F