Hose connection and routing – Great Plains NTA2000D Operator Manual User Manual
Page 79

59
9/13/2006
NTA 2000D 148-632M
Great Plains Mfg., Inc.
Hose Connection and Routing
1.
Assemble the seed hoses from the seed
box to the openers. Route each hose from
the center of the box to the end opener. Fol-
low the same manner of routing until the
end, in which the hose from the outside
opening of the seed box will be routed to
the center opener. Use the hose brackets
in routing the hoses from the seed box to
the openers to keep hose up off the drill.
Note: Using the charts on the right, select the
proper row spacing for your drill to determine
the correct hose to use in each position.
Note: When all of the meter outlets are not used
(i.e: 7 1/2”) it is best to leave the outside meters
open.
150mm Spacing
(6 in)
Row
Number
Hose
Length
(inches)
1
96
2
96
3
96
4
96
5
96
6
115
7
115
8
115
9
115
10
120
11
128
12
128
13
128
14
138
15
138
16
146
17
146
18
156
19
166
20
176
Hose Attachment Route
167mm Spacing
(6 1/2 in)
Row
Number
Hose
Length
(inches)
1
96
2
96
3
96
4
96
5
115
6
115
7
115
8
115
9
120
10
128
11
128
12
138
13
138
14
146
15
146
16
156
17
166
18
176
187mm Spacing
(7 3/8 and 7 1/2 in)
Row
Number
Hose
Length
(inches)
1
96
2
96
3
96
4
96
5
115
6
115
7
115
8
120
9
128
10
128
11
138
12
146
13
146
14
156
15
166
16
176