beautypg.com

Dormant display, Field operations, Final field checklist – Great Plains 2S-2600HDF Operator Manual v2 User Manual

Page 117: Planting sequence, Lank, see “ dormant display ” belo

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Appendix B - Previous Style

Acremeter

113

2014-02-03

Table of Contents

Index

195-069M

3.

During planting (drill lowered and moving forward),
the display blanks (goes dormant), but area tally con-
tinues.

4.

When raised for turns, obstructions and transport,
the drill’s ground drive wheel, contact wheel or clutch
disengages the drive shaft, and the meter counts no
additional (non-planting) rotations.

5.

Whenever shaft rotation stops, the LCD display acti-
vates after 30 to 60 seconds, and remains visible for
30 to 45 minutes.

6.

At the completion of planting, record the final reading
of the grand total. If the display goes dormant before
you can read it, see “Dormant Display”.

7.

Subtract the reading at Step 1 from the reading at
Step 6 f
or the total planted in the present session.

Dormant Display

Refer to Figure 101

To conserve power, the LCD display blanks itself most of
the time. If you need to read the display after if has
“timed out” and gone dormant:

• use the calibration crank to turn the jackshaft once, or

• gently tap or wave a magnet at either of the Great

Plains logo spots

on the lower region of the display.

Be careful not to scratch the window.

Field Operations

This section presumes that all pre-operation checks have
been made on both tractor and drill, and drill is loaded
with seed and any treatments.

Final Field Checklist

Planting Sequence

1.

Lower drill openers at initial seeding point.

2.

Pull forward and begin planting.

3.

Raise drill for turns (meters stop automatically).

❑ Drill hitched, chained and unfolded. See page 14

and page 30.

❑ Set seed and fertilizer drives per charts and calibra-

tion. See page 47 and page 53.

❑ Set drill selector valves (if present) to Markers and

Opener Lift. See page 41 and page 42.

❑ Record acremeter reading if acreage monitoring is

desired.

❑ If installed, Shaft Monitor power ON.
❑ If installed, Point Row Control module ON, and set

for either ALL or SECTION CONTROL.

Figure 101

Meter Display

29898

1

1

This manual is related to the following products: