beautypg.com

Start-up sequence, Power – Tweco 150 Ultra-Cut User Manual

Page 66

background image

Manual No. 0-4800

4-2

OPERATION

Start-Up Sequence

1. Connect system to primary input power.

2. Turn ON/OFF switch to ON (up) position. AC Indicator

turns ON.

POWER

ON

OFF

O

I

OFF

O

Art # A-04812

3. Check the AC indicator. If indicator does not light, reverse two phases of primary input power cable. If indicator

is ON, system is ready to operate (pending fault checks by internal circuitry).