beautypg.com

Motor and cowling installation, Motor.and.cowling.installation – E-flite J-3 Cub 25 ARF User Manual

Page 12

background image

1. Prepare the outrunner motor by attaching the

X-mount to the motor using screws supplied with
the motor.

Motor and Cowling Installation

Required Parts

• Fuselage

• Cowling

• Hook and loop straps (2)

• 6-32 x 1/2" socket head screw (4)

• 2mm x 10mm sheet metal screw (4)

• Propeller adapter

• 12 x 6 electric propeller (APC12060E)

• Brushless outrunner motor

• Electronic speed control

• Battery

Required Tools and Adhesives

• Hex wrench: 7/64"

• Drill

• Drill bit: 1/16" (1.5mm), 1/8" (3mm)

Note:.It.is.very.important.to.be.sure.the.

propeller.is.balanced.before.installing.it.onto.

the.motor.

12