beautypg.com

E-flite Cessna 150 Aerobat 250 ARF User Manual

Page 18

background image

18

E-flite Cessna 150 Aerobat 250 ARF Assembly Manual

10. Recheck the alignment as described in steps

7 through 10. Once satisfied with the alignment,

use a felt-tipped pen to mark the outline of the

fuselage on the top and bottom of the stabilizer.

Also make sure to mark the stabilizer so it can be

returned to the fuselage in the same orientation as

it was aligned.

When cutting through the covering, use a new

#11 blade and light pressure to avoid cutting

into the underlying wood, which could weaken

the underlying structure, causing it to fail in

flight. We also recommend using a hot knife

to melt through the covering to help reduce the

chance of damaging the underlying wood.

11. Remove the stabilizer from the fuselage. Use

a hobby knife and #11 blade to trim the covering

inside the lines drawn in the previous step by 1/16-

inch (1.5mm). Remove the covering, exposing the

bare wood. The lines can be removed using a

paper towel and rubbing alcohol.

12. Slide the elevator assembly into the slot in

the fuselage. Make sure the control horn is facing

toward the bottom of the fuselage.

13. Slide the stabilizer back into position.

14. Slide the hinges from the elevator into the

stabilizer. Fit the elevator against the stabilizer so

there is no gap along the hinge line. Make sure the

elevator can move freely without binding at the tips.

This is much easier to do before the stabilizer has

been glued to the fuselage.