Rockwell Automation 20D DC SCR Precharge Module User Manual

Page 16

background image

1-6

Installation/Wiring

Power Connection for 500A and 750A DC SCR Precharge Modules

Figure 1.4

shows typical locations of bus bars and terminals on 500A and

750A DC SCR Precharge Modules for customer wiring.

Figure 1.4 Bus Bar and Terminal Locations for Wiring 500A and 750A Modules

Table 1.B Power Connection Specifications for 500A and 750A Modules

Item Name

Amps Bus Bars

(1)

(1)

Input/output power bus bar connections require the use of either lug-type connectors to terminate field-installed
conductors or bus bars.

Holes

DC Bus +DCin

500

50mm x 5mm (1.968 x 0.197 in.) 6 x 10mm (0.393 in.)

750

50mm x 5mm (1.968 x 0.197 in.) 6 x 10mm (0.393 in.)

DC Bus +DCout

500

50mm x 13mm (1.968 x 0.512 in.) 4 x 10mm (0.393 in.)

750

50mm x 13mm (1.968 x 0.512 in.) 4 x 10mm (0.393 in.)

Protective Earth (GND)

500

Bolt M10 x 25mm (0.984 in.)

Torque 10Nm (88 lb-in.)

750

Bolt M10 x 25mm (0.984 in.)

Torque 10Nm (88 lb-in.)

Control Terminal Blocks

Refer to

Table 1.D on page 1-8

.

GND

AK

K

A

HK

G

DATA NAMEPLATE

+DCin

+DCout

DANGER

DANGER

CAN CAUSE SHOCK
BURNS, OR DEATH

SURFACES

MAY BE HOT

REMOTE
SOURCE

This manual is related to the following products: