beautypg.com

Class 1 led product, Step 8: install the control cassette in the drive, Step 9: connect the synchlink cables – Rockwell Automation 20D-P2-SLBO PowerFlex 700S Drive Phase II Control SynchLink Board User Manual

Page 9

background image

Rockwell Automation Publication 20D-IN010B-EN-P - November 2010

9

SynchLink™ Board for PowerFlex® 700S Drives with Phase II Control

Step 8: Install the Control
Cassette in the Drive

Install the control cassette in the reverse order of removal. Refer to Step 3:

Remove the Control Cassette from the Drive on page 4

.

Step 9: Connect the
SynchLink Cables

Class 1 LED Product

• Connect the fiber-optic cables to the J1 (transmit) and J2 (receive)

connectors on the SynchLink board. Push the plug into the socket until it
produces an audible click.

ATTENTION: Hazard of permanent eye damage exists when using optical
transmission equipment. This product emits intense light and invisible
radiation. Do not look into module ports or fiber-optic cable connectors.

IMPORTANT

Minimum inside bend radius for SynchLink fiber-optic cable is 25.4
mm (1 in.). Any bends with a shorter inside radius can permanently
damage the fiber-optic cable. Signal attenuation increases with
decreased inside bend radii.

IMPORTANT

Do not overtighten tie-wraps.

J2 (Receive)

J1 (Transmit)

=