beautypg.com

Step 10: close/install the drive cover(s), Step 11: document the change – Rockwell Automation 20D-P2-SLBO PowerFlex 700S Drive Phase II Control SynchLink Board User Manual

Page 10

background image

10

Rockwell Automation Publication 20D-IN010B-EN-P - November 2010

SynchLink™ Board for PowerFlex® 700S Drives with Phase II Control

Step 10: Close/Install the
Drive Cover(s)

Close/Install the drive cover(s) in the reverse of removal. Refer to Step 2:

Open/

Remove the Drive Cover(s) on page 3

.

Step 11: Document the
Change

Document the SynchLink board installation on the “Field Installed Options”
label. Use the blank line if you are installing the SynchLink board in a drive that
was manufactured without it.

FIELD INSTALLED OPTIONS

Firmware

#:

Date

Firmware

20-HIM

28-IO-

20-COMM-

20B_-DB1-

HIM

I/O

COM Module

Internal Dynamic Brake

#:

Date

TIP

Use the packing material from the new SynchLink board to return the
replaced SynchLink board.