beautypg.com

Figure 1, Figure 2, General grounding requirements – Rockwell Automation 22C PowerFlex 400 AC Drive Quick Start - FRN 1-4.xx User Manual

Page 3: Minimum mounting clearances, Frame d & e frame f

background image

PowerFlex 400 Adjustable Frequency AC Drive Quick Start

English-3

Minimum Mounting Clearances

Figure 1: Frame C Mounting Clearances

Figure 2: Frames D, E and F Mounting Clearances

120 mm

(4.7 in.)

120 mm

(4.7 in.)

120 mm

(4.7 in.)

120 mm

(4.7 in.)

25 mm

(1.0 in.)

Mounting Option B

Mounting Option A
No clearance required
between drives.

150 mm

(6.0 in.)

150 mm

(6.0 in.)

50 mm

(2.0 in.)

50 mm

(2.0 in.)

250 mm

(9.8 in.)

150 mm

(6.0 in.)

50 mm

(2.0 in.)

50 mm

(2.0 in.)

Frame D & E

Frame F

General Grounding Requirements

PE

L1

R

L2

S

L3

T

T1

U

T2

V

T3

W

PE

Required

Input Fusing

Required Branch

Circuit Disconnect