Sunnex CS2050D-MRI (Dual Ceiling) User Manual
Page 20

Sunnex Celestial Star MRI Service & Installation Manual
20
Figure 9. Schematic for option 1 (Installing the transformer box outside MRI room using RF
filter)
Option 2 – Installing the transformer box inside the MRI room.
The light is equipped with 30ft of cord on the secondary side and 10ft of cord on the primary side. If installing
the transformer box inside the MRI room. The total length of cord on the secondary side should not be
altered from the original 30ft.
1. Mount electrical box securely to a structural member in the ceiling (ceiling models only) outside of the
safe perimeter (100 Gauss line/10mT) of MRI machinery with a bolt 1/2" diameter x 2" L. (Four holes
are provided on the base plate of transformer box).
2. It is recommended not to mount the electrical box on wall.
3. An access panel should be constructed to allow access to the transformer box for maintenance and
repair such as fuse replacements.
4. Velcro is provided on the base plate of the electrical box and a rope and snap-on hook is provided on
the electrical box to assist in proper installation.
5. Plug lamp lead connector into the receptacle on the side of the electrical box. CAUTION: Lamp lead
connector has a mechanical latch. Be sure lamp connector is fully engaged into electrical box
Celestial
Star MRI
Power
Supply
RF Filter
MRI ROOM
Celestial Star MRI
Ceiling Light
Celestial Star MRI
Mobile Light
From RF
filter to MRI
Light
Output from
Transformer Box
to RF Filter
Hospital Grade
Cord with Plug
RF Panel