beautypg.com

Stainless Works Jeep Grand Cherokee SRT8 2012-14 Headers User Manual

Page 2

background image

WWW.STAINLESSWORKS.NET

800-878-3635

FAX: 440-543-9183

10. Disconnect exhaust from 2 bolt flanges with (4) 8mm spring loaded nuts.

11. Remove left brace at transmission cross member (4) 10mm bolts.

12. Remove right brace at transmission cross member (2) 10mm bolts.

13. Remove catted pipes from manifolds (4) 10mm bolts.

14. Support transmission and remove (6) 10mm bolts and (2) 10mm nuts from cross

member and transmission mount and remove cross member.

15. Remove (12) 10mm bolts holding front driveshaft and remove.

16. Remove heat shield from starter (1) 6mm bolt, (2) 8 mm nuts.

17. Remove (16) 8mm bolts from manifolds and remove manifolds.

18. Install O2 extensions Front #109209, Rear #109210.

19. Loosely install lower header bolts (4) 8mm per side.

20. Install right header using (3) 8mm upper bolts and one original bolt with dipstick

spacer.

21. Install dipstick.

22. Install left header using (4) 8mm upper bolts.

23. Reinstall starter head shield (may require bending to get in place) using (1) 6mm

bolt (2) 8mm nuts.

24. Reinstall front O2 sensors.

25. Reinstall front drive shaft (12) 10mm bolts.

26. Reinstall transmission cross member (6) 10mm bolts and (2) 10mm nuts.

27. Install catted or off road lead pipes using 3” clamps.

28. Reinstall rear O2 sensors and the rubber 5/16 hose. (See picture below).