beautypg.com

Stainless Works Cadillac CTSV 2009+ Catback User Manual

Page 2

background image

WWW.STAINLESSWORKS.NET

800-878-3635

FAX: 440-543-9183

12. Install X-pipe to leads using (2) 3” clamps. Level the X-pipe. Note: This is a

critical step as the X-pipe needs to be level (side to side) and centered in the
channel!

13. Install tail pipes using (2) 3” clamps.


FOR SEDAN AND WAGON ONLY

14. Install mufflers into tails and hangers using (2) 3” clamps.



FOR COUPE ONLY

15. Install mufflers into hangers and onto tails using (2) 3” clamps.

16. Install tips using (2) 3” clamps.



FOR ALL VEHICLES

17. Tighten and adjust system.

18. Reconnect battery.

19. Be sure to have adequate clearance around all wires, hoses and lines. If anything

is in contact with the exhaust system, it will melt. Make sure to have at least
½” of clearance and wrap any suspect areas with DEI thermal barrier wrap.

20. After double checking for clearance and making sure all lines, wires and hoses are

secured, drive the car for 10-20 miles and re-check all clamps and clearances.
Your system may be tack welded at the joints/ clamps to reduce shifting of the
system during heating and cooling cycles. Make certain to disconnect the battery
before performing any welding.

This manual is related to the following products: