Brother BES-1261BC User Manual
Page 27
Chapter 1 Preparation of Embroidery Machine
BES-961BC
•
BES-1261BC
25
■
BES-1261BC
r
Bridge
Connecting shaft
Fixing bracket
Fixing bracket B
1.
Remove 3 pieces of fixing screw
q
,loosen 2 pieces of screw
w
and remove the color change
cover
e
.
2.
Remove the bolts
r
and detach the fixing bracket for transportation from the bridge and the
connecting shaft.
3.
Loosen the bolts
t
and move the needle bar case
y
left side.
4.
Press the change bracket collar
i
against the change case base
u
, while pressing the left
side change bracket collar
o
against the change case base
u
, and tighten the bolts
t
.Check
that needle bar No.1 and 12 are inserted into the needle plate holes smoothly.
(Notes)
•
Check that ther is no play for the connecting shaft in the horizontal direction.
•
If the bolt of the right side change bracket collar
i
is loosened, the change bracket collar
i
may be
dislocated and adjusting position of the needle bar case
y
will be required. So don’t loosen this bolt.
5.
Attach the color change cover
e
by 3 pieces of fixing screw
q
and 2 pieces of fixing screw
w
.
u
e
i
w
q
t
o
q
o
y