Maintenance and troubleshooting, Maintenance, Initial maintenance – MK Diamond MK-2005G User Manual
Page 27: Maintenance following use
MK-2005G
Revision 04/2003, Effective Date April 2, 2003
Page 27
MAINTENANCE AND TROUBLESHOOTING
MAINTENANCE:
1. Initial Maintenance:
Perform the following after initial purchase and operation of the MK-2005G.
2. Maintenance Following Use:
To extend the life of the MK-2005G, the following procedure should be performed after each use. Lubricate
all points listed below with light oil such as, 3 in 1, WD-40, etc.
(B)
Check and adjust V-belt tension
Following 1
st
48 hours of operation
See V-belt Inspection
(A)
Change engine oil after 1
st
month or 1
st
20 operating hours
(See Engine Oil Change)
(B)
Lubricate the Movable Cutting
Table Roller Wheels
(A)
Place Engine Switch
in the OFF position
(C)
Lubricate Torsion Spring
(E)
Lubricate engine throttle linkage
(D)
Lubricate Blade Guard Pivot
Points and Adjustment Bar
Change Oil
Engine Switch
Direction of
Movement
Lubricate Roller Wheels
Torsion Spring
Adjustment Bar
Pivot Point
Throttle Linkage
Inspect V-Belts