beautypg.com

2 operation with another supplier, Operation with another supplier, Electrical installation – Lenze ECSEKxxx User Manual

Page 57: Stop

background image

Electrical installation

Wiring

Operation with another supplier

4

57

EDKCSEK002 DE/EN/FR 2.0

4.4.2

Operation with another supplier

Stop!

ƒ

After mains connection, wait at least one second before bridging
the charging current limitation (X26 = HIGH).

ƒ

Only release the controller (X6/SI1 = HIGH) if the charging
current limitation is bridged.

t [s]

HIGH (1)

LOW (0)

ECSx

: X6/SI1

ü

t [s]

100 %

0 %

t [s]

HIGH (1)

LOW (0)

ECSxK: X26 (24 V DC)

t [s]

HIGH (1)

LOW (0)

K1

U

ZK

1

ECSXK011

Fig. 4-3

Level/time diagrams for operation with other supplier

ECSx

Axis module of the ECS series

U

DCbus

DC-bus voltage

ECSxK

Capacitor module of the ECS series

K1

Mains contactor