5 commissioning, 1 before switching on, 2 activation of profibus at the servo inverter – Lenze 931W User Manual
Page 18: Commissioning, 5commissioning

Commissioning
Before switching on
5
18
K-HB 13.0001-EN 2.1
5
Commissioning
5.1
Before switching on
Stop!
Before you switch on the basic unit for the first time in the PROFIBUS-DP
network, check
ƒ
the entire wiring for completeness, short circuit, and earth fault.
ƒ
whether the bus system is terminated at the first and last station with the
integrated active bus terminating resistor.
5.2
Activation of PROFIBUS at the servo inverter
Before operating on the PROFIBUS the configuration is carried out via the user interface of
the system. If you are not familiar with the user interface, you will find a detailed
description in the corresponding documentation (see Software Manual 931 M/W).
pÉíìé
Start the operating program and check the settings of the serial communication interface
in the Setup menu. The servo inverters are set by default to a baud rate of 1.5 MBaud.
931mPro_001