Commissioning

Before switching on

5

18

K-HB 13.0001-EN 2.1

5

Commissioning

5.1

Before switching on

Stop!

Before you switch on the basic unit for the first time in the PROFIBUS-DP

network, check

ƒ

the entire wiring for completeness, short circuit, and earth fault.

ƒ

whether the bus system is terminated at the first and last station with the

integrated active bus terminating resistor.

5.2

Activation of PROFIBUS at the servo inverter

Before operating on the PROFIBUS the configuration is carried out via the user interface of

the system. If you are not familiar with the user interface, you will find a detailed

description in the corresponding documentation (see Software Manual 931 M/W).

pÉíìé

Start the operating program and check the settings of the serial communication interface

in the Setup menu. The servo inverters are set by default to a baud rate of 1.5 MBaud.

931mPro_001