beautypg.com

Utility connections – CHAMPION CG Manual User Manual

Page 11

background image

3

Installation

Utility Connections

27" [686]

2½" [64]

8¾"

[222]

1

2

3

Plan View

6¼" [156]

6¼" [156]

7¼" [181]

25" [635]

6 ft.

(1.5M)

Front View

39" [991]

5½" [140]

4¾" [121]

1

2

3

Side View

13½" [343]

8¾" [222]

17¾" [451]

3

2

1

39" [991]

7¼" [184]

4

All utility connections must be performed

by qualified people that will follow electric,

plumbing, and sanitary codes and regulations.

Contact the Manufacturer's National Service Dept. for assistance.

ATTENTION

Champion Industries

1-800 858-4477

4

3

2

1

Hot Water Connection:

140-160°F/60-71°C

½" IPS

Flow pressure 25-95 PSI [173-655 kPa].

Install water shut-off valves and check-valves

in the water inlet supply lines and

as close to the machine as possible

Cold Water Connection:

75°F/24°C

½" IPS

Flow pressure 25-95 PSI [173-655 kPa].

Install water shut-off valves and check-valves

in the water inlet supply lines and

as close to the machine as possible

Drain Connection:

Gravity

1½" Tailpiece (slip-fit)

Maximum drain flow 3 US gallons/min [11L/min]

Electric Connection:

208-230VAC/50-60HZ/1PH

Min/Max 15A

6 ft. /1.5 m flexible cord and plug supplied

NEMA 6-15P electric outlet