2 attaching the chipper deflector, 3 attaching the optional discharge tube – Echo 77412 Owners Manual v.3 User Manual
Page 12
Crary Bear Cat Owners Manual
10
ASSEMBLY
2.2 ATTACHING THE CHIPPER DEFLECTOR
MODELS: ALL MODELS
1. Move the chipper deflector weldment inside the chipper
housing down towards the trailer (Figure 2.10)
2. Slide the chipper deflector onto the chipper housing ensuring
that the weldment bolts fit securely into the notches on the
disk cover (Figure 2.8). Tighten using 5/16" flange nuts.
3. Insert two 3/8" x 5-1/2" bolts into the bolt holes on the chip-
per deflector and tighten using 3/8" washers and 3/8" nylock
nuts.
2.3 ATTACHING THE OPTIONAL DISCHARGE
TUBE
MODELS: 77412(S), 77413(S)
Move the chipper deflector weldment inside the chipper
housing upward (Figure 2.10).
Slide the discharge tube onto the chipper housing ensuring
that the weldment bolts fit securely into the notches on the
disk cover (Figure 2.9). Tighten using 5/16" flange nuts.
Insert two 3/8" x 5-1/2" bolt into the bolt holes on the chipper
deflector and tighten using 3/8" washers and 3/8" nylock
nuts.
1.
2.
3.
Figure 2.8 - Chipper Deflector
Figure 2.9 - Optional Discharge Tube
Figure 2.10 - Chipper Deflector Weldment
Figure 2.6 - Standard Trailer Configuration
(Models 77413, 77413S)
Figure 2.7 - Optional Trailer Configuration
(Models 77413, 77413S)